EXperts you can trust. Technologies you can depend on.

Experts you can trust. Technologies you can depend on.

Calibrant Gas Valves for Mass Spectrometers

Parker Series 9 valve with labelled electrical leads, solenoid actuator, stainless steel body, and A-LOK tube fittings

Build a calibrant inlet around your instrument’s calibration sequence

Air Engineering Group (AEG) helps mass spectrometer OEMs specify calibrant gas valves and develop inlet assemblies around their instruments. We select Parker valves, design the manifold or inlet layout, and support prototype testing. We can also supply assembled units for repeat production.

A calibrant gas valve controls when a reference gas or vapour enters the instrument for calibration or tuning. Parker lists its Series 9 miniature solenoid valves for this duty. We start with the reference medium, the permitted leakage between calibration runs, and the connection to the instrument.

Discuss your calibrant inlet project requirement with AEG

Define how the reference gas reaches the analyser

When we review your schematic, we follow the calibrant from its source to the analyser. We ask what reaches the valve, how long the valve needs to open, and what you need to see at the instrument. That could be a specified gas flow or a reference signal within an agreed range.

Show where any regulator or restrictor sits in the circuit and give the pressures at both valve ports during admission and standby. If a restrictor sits between the valve and the vacuum chamber, identify the pressure at each location. Use absolute pressure for points under vacuum.

Specify seat leakage and external leakage separately

A closed valve can still pass a small amount of gas across its seat. In a calibrant circuit, that can introduce reference gas between calibration runs. An external leak is a separate path. For example, a fitting or seal can let air into a section of the inlet that operates under vacuum.

Tell us the permitted leak rate for each path, including the units, test gas, and pressures on both sides. We use those details to confirm the requirement for the selected valve and agree how to check the assembled inlet.

Calibrant inlet design from valve selection to bench testing

Match the Parker Series 9 valve to your inlet

The Series 9 range includes two way normally closed valves for a dedicated feed and three way valves for switching between connected paths. Choose the switching function first, then check the orifice, pressure rating, and porting against your circuit. The three examples below use 24 VDC coils.

Parker Series 9 part numberValve functionPublished portingOrifice and maximum operating pressure
009-0172-900Two way normally closed1/16 inch A-LOK0.76 mm, 1,250 psig (86.2 bar gauge)
009-0272-900Two way normally closed1/4-28 UNF female0.76 mm, 1,250 psig (86.2 bar gauge)
009-0269-900Three way1/8 inch A-LOK1.52 mm, 100 psig (6.9 bar gauge)


For a compression connection, confirm the tube outside diameter and the space available to tighten the fitting. For a threaded port, check the mating fitting and how it seals. That detail can determine whether the valve fits an existing inlet or needs a revised layout.

Read the Parker Series 9 calibrant valve guide for valve functions and drive guidance. Compare part numbers in the Parker Series 9 calibrant valve range, or explore our Parker miniature valves and OEM fluid control solutions.

Make the calibrant inlet accessible for assembly and servicing

We look at how the valve and restrictor will mount, where the tubing can be supported, and whether your team can reach the connections once the instrument is assembled. If the reference source needs regular replacement, we look for a layout that allows access without disturbing neighbouring gas lines.

For repeat builds, we agree which tubing, fittings, and mounting hardware belong in the supplied inlet assembly. The assembly drawing shows how the inlet mounts, how it should be orientated, and where the reference source and analyser lines connect. We also specify which connections your production team makes during final installation.

Explore ISAR Integrated Fluid manifold technology Solutions

Check the reference signal during admission and after shutoff

Before building the prototype, we agree the usable reference signal range, how quickly it needs to settle after the valve opens, and how much signal can remain when sample measurements resume. We plan the checks around the intended driver, inlet tubing, and restrictor where fitted.

Record the reference signal before, during, and after several admissions, with the valve commands marked on the trace. This lets your team compare how consistently the inlet delivers the reference and how quickly the signal returns to background. If the signal persists after shutoff, a separate seat leak check can help distinguish continuing gas admission from calibrant remaining in the line.

Explore AEG’s OEM Custom Manifold Solutions

Calibrant gas valve selection questions

Q1: What should I specify if the calibrant is stored as a liquid?

Tell us whether liquid or vapour reaches the valve. Some instruments draw vapour from a liquid reference compound in a vial. Give us the compound and the temperature at the valve so we can assess the selected configuration and where vapour might condense in the inlet.

Q2: When would I use a three way valve in a calibrant circuit?

A three way valve can switch a common port between two paths. If your instrument uses it to switch between the sample and calibrant paths, check which ports connect when the coil is energised and when power is removed.

Q3: What does non-isolation mean for the Parker Series 9?

Parts of the valve mechanism come into contact with the gas. Check compatibility with all materials the gas touches, including the seat, seals, and moving components in the selected configuration.

Q4: How does valve switching time relate to calibration timing?

Parker lists a valve response time below 6 ms at 23°C. The time it takes to obtain a usable reference signal also depends on the restrictions, volume of the connecting passages, and instrument response. Measure the interval from the opening command to the usable signal on the prototype.

Q5: Which coil voltages are available for the Series 9?

Parker offers 12 and 24 VDC options across the range. Confirm the full ordering code and check that your driver can support the intended opening time and switching sequence.

Discuss your calibrant inlet with AEG

Start with the design information you already have

Tell our OEM Fluid Technology Division what you need to resolve before the next build. You might be fitting the inlet into an existing enclosure while keeping the fittings accessible, matching a replacement valve to the inlet connection and sealing arrangement, or investigating why the reference signal is slow to return to background after shutoff.

An inlet drawing, the full valve part number, or a short bench trace gives us a starting point. If you share a trace, mark when the controller commanded the valve to close.

Call 01342 826488 or email info@aegroup.uk.com.

Specifying valves and manifolds for gas blending

With the calibrant inlet design agreed, we help specify it for repeat builds. We record the full Parker Series 9 part number, connections to the reference source and analyser, and who supplies the restrictor, fittings, and electrical connector. We flag changes to the valve orifice, porting, or restrictor position for engineering review before reordering.

For valve functions, port options, and drive requirements, read the Parker Series 9 calibrant valve guide. Compare part numbers in the Parker Series 9 calibrant valve range, or explore our wider Parker miniature valves and OEM fluid control solutions.

Work through your calibrant inlet design with AEG

What do you need to resolve before your next mass spectrometer build? You might be adding a reference source, deciding where to place a restrictor, or investigating why the reference signal takes longer than expected to settle after the valve opens.

AEG’s OEM Fluid Technology team can review the path from the reference source to the analyser with your engineers. We’ll help you decide which Parker Series 9 valve to assess, where to revise the inlet layout, or what to measure in the next calibration run.

Tell us which part of the calibration sequence you’re working on and what you need the analyser to see. A marked drawing, an outline of the sequence, or a short note from the bench gives us a starting point.