Sample Switching Valves for Online Water Quality Analysers
Build the sample circuit around your analyser’s measurement cycle
Sample switching valves route water samples, reagents, and cleaning fluids through an online analyser in the order its method requires. Air Engineering Group (AEG) helps OEMs specify Parker isolation valves, design the tubing or manifold, and test the circuit in a prototype. We can also supply assembled manifolds for repeat production.
We start with what passes through each valve during sampling, measurement, and cleaning. The sample chemistry, the cleaner the valve will see, and the time allowed before the next reading all help guide the design.
Map the sample, reagent, and cleaning paths
Show where each sample enters, where reagents join it, and where liquid drains to waste. On a multistream analyser, we trace each sample line to the shared measurement cell or vessel. That shows which passages a new sample must clear after the valve switches.
We also mark which paths need to open together and what each valve should do when power is removed. With those states defined, we can check the switching function before deciding where the valves and connections will sit.
Check compatibility with every liquid the valve sees
We ask for the sample conditions at the valve, including the expected pH, temperature, and whether the sample reaches it raw or after conditioning. Include the reagents, rinse fluids, and cleaning chemicals that use the same path, with their concentrations at the valve.
A diaphragm isolation valve separates the liquid from the actuator. We check the materials that still contact the liquid, including the valve body, diaphragm, seals, tubing, and fittings. If the analyser has a soak stage, include how long the cleaner stays in the circuit.
From isolation valve selection to the first sample reading
Choose a Parker valve that fits the circuit
Parker LQX12 valves suit layouts where several valves need to sit close together on a manifold. Parker Series 1 and Series 2 offer threaded connections and PTFE wetted components, with borosilicate glass also in the Series 1 wetted path.
| Parker valve | Switching function | Published wetted materials | Connection |
|---|---|---|---|
| LQX12 | Two way normally closed or three way universal | PEEK wetted components with EPDM or FFKM diaphragm options. Check the manifold seal for the selected configuration. | 12 mm manifold spacing, with an optional 1/4-28 ported base |
| Series 1 | Three way | PTFE and borosilicate glass | 1/4-28 threaded ports |
| Series 2 | Two way normally closed | PTFE | 1/4-28 threaded ports |
Parker publishes a 1.52 mm orifice and a pressure range from vacuum to 20 psig for Series 1 and Series 2. For the LQX12, check the selected configuration’s port pressure limits, particularly if a pump draws through the valve or the wash line is pressurised.
Read the Parker LQX12 isolation valve guide for port arrangements and mounting details. Compare part numbers in the Parker Series 1 and 2 PTFE isolation valve range, or explore our wider Parker miniature valves and OEM fluid control solutions.
Lay out the manifold for flushing and servicing
Carryover occurs when liquid from an earlier sample or wash reaches the next measurement. We trace the shared path from the switching valve to the measurement cell and look for places where liquid could remain after draining, such as a tee or a branch the rinse may miss.
We check that your team can reach the fittings and remove a valve for routine servicing once the manifold is inside the analyser. For repeat builds, we agree which valves, fittings, and tubing AEG supplies with the assembly and which connections your production team makes during installation.
Check the first result after a sample change
Before testing, we agree how much the first reading may differ from the expected result and how long the analyser can spend flushing. We plan the check around the intended pump, tubing, and measurement sequence.
Run a representative sample with a higher concentration, then switch to one with a lower concentration. Compare the first result after switching with the established reading for the lower sample. Repeat the check after cleaning to see whether residual cleaner affects the next result. If the reading stays outside tolerance, check leakage through the closed sample channels separately.
Water analyser valve selection questions
Q1: When should I use a three way valve for sample switching?
Use it when one common line needs to select between two paths. Confirm which path connects when the coil is energised and when power is removed.
Q2: What if the analyser dilutes the cleaner before use?
Check where dilution takes place. A valve upstream of that point may see the stock chemical, while one downstream may see the working concentration. Assess each valve against what reaches it.
Q3: Can the valve see suction with an unpressurised sample supply?
Yes. A downstream pump can pull the valve outlet below atmospheric pressure. Give us the lowest expected outlet pressure and say where you measured it.
Q4: Why do different sample line lengths matter?
Longer lines can hold more liquid at the same bore. Check how long a fresh sample takes to reach the measurement cell from each inlet before setting the delay for the first reading.
Q5: How should I describe a sample containing suspended solids?
Give the particle size and concentration if known. Show any filter or other sample conditioning on the schematic so we can assess what reaches the valve.
Discuss your water analyser circuit with AEG
Specify the sample circuit for your next water analyser
Tell our OEM Fluid Technology Division what you need to resolve before the next build. If you’re adding a sample stream or changing the cleaner, we can review the valve function and check the body, diaphragm, and seals against the liquids they’ll contact.
If readings shift after a switch, we can help check for liquid left in shared passages or leakage across a closed valve seat.
A marked circuit sketch, an existing valve part number, or the name and concentration of your cleaner gives us a starting point.
Call 01342 826488 or email info@aegroup.uk.com.
Document the sample paths for production and servicing
We match the manifold port labels to the channel names in your analyser’s control sequence. Using those same names on the tubing schedule gives production and service teams a clear reference when connecting sample, reagent, and rinse lines. The assembly drawing also shows the manifold’s installed orientation and identifies any blanked ports for the selected analyser configuration.
For manifold spacing, read the Parker LQX12 isolation valve guide. For threaded options, browse the Parker Series 1 and 2 PTFE isolation valve range. Explore other valve families in our Parker miniature valve and OEM fluid control hub.
Review your water analyser’s valve sequence with AEG
Tell us which step in the measurement cycle you’re working on. AEG’s OEM Fluid Technology team can review how valve switching and pump timing affect when a fresh sample reaches the measurement cell. We’ll help you decide whether to test a change to the switching order, the rinse step, or the delay before measurement.
If you have bench results, include which sample lines were active before and after the switch, the valve commands, and the rinse duration. Mark when the analyser took its first reading and when the signal stabilised.