EXperts you can trust. Technologies you can depend on.

Experts you can trust. Technologies you can depend on.

Parker Series 3 Miniature Inert Liquid Valves for OEMs

Parker Series 3 liquid valve with labelled electrical leads, solenoid actuator, PEEK body, and barbed tubing connections

Liquid switching for medical, analytical, and life science equipment

As a supplier of Parker precision fluid control products, Air Engineering Group (AEG) uses practical experience in specifying miniature valves for medical and analytical OEM equipment, considering their role within assembled fluid circuits.

Parker Series 3 liquid valves open, close, or select liquid paths. In addition, the range includes two way normally closed and three way configurations, with a PEEK body, PTFE and stainless steel wetted components, and FKM or EPDM seals.

Parker lists reagent control, wash solutions, bleach, and waste removal applications. However, non-isolation construction requires assessment of every wetted material. Bleach compatibility depends on the exact part number and operating conditions.

How Parker Series 3 liquid valves work

The electromagnetic coil moves an internal armature to change the liquid path. Direct acting operation therefore does not require pressure or vacuum to actuate the valve. Two way valves provide shutoff, while three way versions switch the common connection between two paths.

ConfigurationCoil deenergisedCoil energised
Two way normally closedLiquid path closedLiquid path open
Three wayCommon connected to normally open portCommon connected to normally closed port

Liquid delivery depends on pressure differential, orifice size, viscosity, and the connected circuit. Check port assignments and switching function against the selected drawing.

Medical, analytical, and life science applications

Clinical diagnostic reagent and wash control

Parker identifies clinical diagnostics as a Series 3 market. For example, OEM designers can evaluate the valve for reagent admission, wash solution selection, and waste removal. Confirm the selected materials and bleach configuration, then qualify leakage, flushing, and liquid delivery within the diagnostic instrument.

Life science and laboratory automation

Potential OEM uses include buffer routing, reagent selection, and cleaning circuits within laboratory automation modules. Therefore, assess the entire wetted path for compatibility and contamination requirements. Then validate flow, switching sequence, and flushing with representative liquids before selecting a configuration for the intended research workflow.

Analytical chemistry liquid circuits

Series 3 can also be assessed for liquid switching in analytical instruments, including wash and waste paths. Match the required function and orifice to the circuit, then evaluate sample chemistry, pressure differential, connecting volume, and residual liquid at the instrument’s intended measurement point.

OEM cleaning and waste management

Parker illustrates Series 3 in a bleach wash system that selects between bleach and deionised water and supplies multiple subsystems. Similar OEM circuits therefore require defined cleaning sequences, validated material compatibility, and controlled waste routing. Also confirm the selected part’s bleach compatibility and service conditions.

Why specify Parker Series 3 valves

Materials selected for liquid circuit compatibility

The PEEK body and PTFE components are combined with stainless steel and FKM or EPDM sealing parts. This documented material arrangement therefore gives designers a basis for selection. However, review every wetted component against the actual liquid, concentration, temperature, and cleaning sequence before qualification.

Direct acting control across the operating sequence

Parker’s direct acting design does not require pressure or vacuum to operate. This is therefore useful when a liquid circuit starts without an established pressure differential. Also confirm the selected valve’s pressure limits and verify shutoff, opening, and delivery performance throughout the intended operating sequence.

Connection choices for compact OEM assemblies

Barbed and manifold mounting options allow designers to assess different integration arrangements. Internal volume varies with the connection format, so review the selected drawing alongside tubing and mounting space. Also define the assembly interface early to manage routing, flushing, access, and accurate production sourcing.

Published evidence for repeated liquid switching

Parker publishes an application dependent life rating of ten million cycles and separate bleach test evidence. These therefore provide useful qualification references for OEM design reviews. Then establish acceptance criteria for response, leakage, and material condition using the actual liquid, duty cycle, and maintenance plan.

Series 3 specifications for OEM selection

These values summarise Parker’s published datasheet. Confirm the current specification and drawing for the selected part.

SpecificationPublished information
Valve typeInert non-isolation liquid solenoid valve
FunctionsTwo way normally closed or three way
BodyPEEK
Other wetted materialsPTFE, stainless steel, and FKM or EPDM seals
Coil voltage and rated power12 VDC: 2.5 W; 24 VDC: 4.2 W
ResponseBelow 12 ms cycling
LeakageBubble tight; no numerical threshold stated
Ambient operating range4 to 66°C
Recommended filtration40 µm maximum
ConnectionsBarbs for 1/16, 1/8, or 3/16 inch ID tubing; manifold options
Published internal volume238 µL: 1/16 inch barb; 326 µL: 1/8 inch barb; 516 µL: 3/16 inch barb; 208 µL: manifold
Life ratingTen million cycles, application dependent

Internal volume describes fluid held within the valve. Tubing and fittings add connecting volume; qualify dispensed volume within the assembled circuit.

Match orifice size to operating pressure

Maximum pressure decreases as orifice size increases. Parker also lists vacuum operation; confirm the required conditions for the selected part. 

Orifice diameterMaximum pressureApproximate bar equivalent
0.055 inch / 1.40 mm100 psig6.9 bar
0.078 inch / 1.98 mm50 psig3.4 bar
0.090 inch / 2.29 mm20 psig1.4 bar

Parker’s typical flow curve was measured with water at 24°C. Therefore, select flow using the intended liquid and pressure differential, rather than orifice diameter alone.

The above component specifications come from Parker’s Series 3 Valve datasheet.

Learn more about Parker Miniature Valves and Components

Bleach qualification and seal selection

Parker reports testing a Series 3 bleach valve beyond six million cycles with no component degradation, while meeting response, internal leakage, and external leakage specifications. The test used a standard bleach concentration for IVD instrumentation. However, these results are separate from the application dependent ten million cycle rating.

The ordering table identifies bleach compatible part numbers separately. Both FKM and EPDM appear favourably against bleach in the abbreviated compatibility chart, but all EPDM ordering entries are marked non-bleach. Seal material alone therefore does not establish whole valve suitability.

For solvent selection, Parker does not recommend FKM with methanol or acetonitrile, EPDM with toluene, or either seal with tetrahydrofuran. Therefore, confirm the entire wetted path against concentration, temperature, exposure, and cleaning conditions.

Integrating Series 3 valves into an OEM liquid circuit

Qualify the entire wetted fluid circuit

Review the valve, tubing, fittings, pumps, and cleaning agents together. Then specify the actual liquids, concentrations, temperatures, and exposure periods. Select the orifice using the required flow and pressure differential; however, Parker’s typical flow curve was measured with water at 24°C.

Also include filtration, leakage, flushing, and switching performance in prototype qualification. Measure liquid delivery at the intended outlet, accounting for viscosity, connecting volume, and trapped air. Confirm that the cleaning sequence removes residual media from shared passages under representative operating conditions.

Match electrical drive to the operating sequence

Assess supply capacity and enclosure temperature for the number of valves energised together. The published electrical requirements differ between the 12 and 24 VDC coils, so verify the selected part before designing the driver. Parker also documents reduced voltage holding to manage power and heat.

Therefore, validate opening and release timing, electrical suppression, and holding margin under representative operating pressure and temperature conditions. Check lead routing, mounting space, and connection access against the selected drawing before finalising the assembly and production specification.

Published hit and hold settings

Parker documents a 25 ms hit at rated coil voltage, followed by these reduced holding settings. Therefore, validate them for the selected valve and circuit.

Coil voltageValve functionHolding voltageHolding power
12 VDCTwo way5 V0.44 W
12 VDCThree way6 V0.63 W
24 VDCTwo way8 V0.46 W
24 VDCThree way12 V1.04 W

Published bleach compatible ordering examples

These FKM configurations are marked bleach compatible in Parker’s ordering table. However, confirm current part specifications, operating conditions, and availability before ordering.

ConfigurationConnection12 VDC part24 VDC part
0.055 inch two way NC1/16 inch barb003-0860-900003-0861-900
0.055 inch two way NCManifold mount003-0872-900003-0873-900
0.055 inch three way1/16 inch barb003-0862-900003-0863-900
0.078 inch two way NC1/8 inch barb003-0864-900003-0865-900
0.078 inch two way NCManifold mount003-0881-900003-0882-900
0.078 inch three way1/8 inch barb003-0866-900003-0867-900
0.090 inch two way NC3/16 inch barb003-0868-900003-0869-900
0.090 inch three way3/16 inch barb003-0870-900003-0871-900

Other FKM and EPDM configurations are available. However, FKM seals alone do not establish whole valve bleach compatibility.

Specify with confidence from prototype to production

the right configuration for procurement

Specify the Parker part number alongside function, orifice, seal material, bleach requirement, coil voltage, and connection format. In addition, include operating and cleaning media, inlet and outlet pressures, flow targets, and mounting details.

For development enquiries, provide sample quantities and the qualification timetable. For production sourcing, also include forecast volumes, delivery requirements, required documentation, and agreed restrictions on substitutions.

Then assess acquisition cost alongside driver hardware, assembly time, qualification, and planned maintenance. Confirm lead times and current availability for the selected part; changes in seals, connections, or function require engineering review.

Discuss your OEM calibrant valve requirements

AEG’s OEM Fluid Technology Division combines medical and analytical fluid control experience with knowledge of valve specification, material compatibility, and integration. Our team guides component selection and assembly development, considering function, pressure, flow, wetted materials, electrical drive, and cleaning requirements.

Share your schematic, process and cleaning liquids, concentrations, inlet and outlet pressures, required flow, switching sequence, electrical supply, temperatures, and expected quantities so we can recommend suitable options.

Browse the Parker Series 3 liquid valve range, or contact Air Engineering Group on 01342 826488 or email info@aegroup.uk.com to discuss your medical, analytical, or life science liquid control application.

Find the right Parker valve for your OEM medical or life science application with guidance from Air Engineering Group. Whether you have a part number, a specification, or a fluid control challenge to solve, we can help you assess suitable options and move your project forward.

From selecting and specifying valves for prototype equipment to procurement and after sales support, AEG works with your engineering and purchasing teams to clarify requirements, address integration challenges, and match valves to your application.

Tell us about your application using the form below. Share the details you have, even if your requirements are still developing, and our team will help you identify the next step.