Parker C21 Cartridge Solenoid Valves for OEM Gas Control
Miniature manifold mounted switching for medical, analytical, and pneumatic equipment
Air Engineering Group supplies Parker C21 miniature cartridge solenoid valves for OEM gas control assemblies. The range offers two way normally closed and three way normally closed configurations, allowing designers to select isolation or supply and exhaust switching within a machined manifold.
Choose the valve function before comparing orifice sizes. The maximum pressure varies between two way and three way versions, so the family rating of up to 10 bar does not apply to every configuration. Therefore, assess the selected valve against inlet pressure, outlet pressure, required flow, and the operating sequence.
This guide covers pneumatic selection and integration. For liquid circuits, instead use the dedicated Parker C21 liquid valve information and confirm compatibility for the intended media.
What cartridge mounting provides
The cartridge fits into a prepared manifold cavity, with external seals separating the pneumatic passages. This arrangement can therefore reduce external tubing connections and bring switching closer to the controlled volume. However, its practical value depends on cavity accuracy, passage layout, retention, and access for servicing.
Design the manifold and valve as one assembly. Specify machining tolerances, seal contact surfaces, deburring, cleaning, and retention before releasing the block for manufacture. Then verify the assembled circuit for leakage and the required pressure response.
How the valve functions
A two way normally closed valve isolates its controlled passage when de-energised and opens when energised. In contrast, a three way normally closed valve switches the controlled port between supply and exhaust in the pressure arrangement shown by Parker.
Parker provides separate port arrangements for pressure and vacuum use. Therefore, follow the drawing for the selected function rather than assuming identical supply and load connections. Check the behaviour during power loss, start-up, and transitions between operating states under representative conditions.
OEM applications
Compression therapy
Assess inflation and exhaust performance against cuff volume, tubing resistance, and the required pressure profile. Then qualify pressure rise, venting time, leakage, and repeated switching within the assembled device. Also include the behaviour of adjacent channels when several valves operate together.
Oxygen concentrators and conservers
Parker identifies oxygen concentrators and conservers as applications. However, confirm the specific valve’s suitability for the oxygen concentration, pressure, materials, and cleanliness requirements. Establish the required delivery behaviour through device testing instead of treating an air flow reference as oxygen performance.
Negative pressure wound therapy
Assess the valve against the vacuum circuit, connected volume, and gas exposure conditions. Also define contamination protection and prevent collected liquids reaching the pneumatic assembly. Then qualify pressure recovery, venting, leakage, and operating sequences under representative conditions.
Analytical gas control
For gas switching assemblies, consider passage volume, leakage, purge requirements, and the effect of upstream regulation. Then validate the time needed for the selected gas to reach the measurement point. Also include manifold passages and tubing when assessing residual gas and switching delay.
Parker C21 Miniature Cartridge Solenoid Valve Selection benefits
Compact manifold integration
Cartridge mounting provides a route to integrating valves into a common block. However, evaluate the resulting assembly against the available envelope, wiring access, service clearance, and the number of controlled channels.
Published performance references
Use Parker’s published response and reliability figures as qualification inputs. Then validate actual switching behaviour and service life with the selected gas, pressure conditions, electrical drive, and intended operating duty.
Function and orifice choice
Two way and three way configurations provide different circuit functions. Select the orifice using its specific pressure limit and the required flow, then assess the restrictions imposed by manifold passages, filters, tubing, and fittings.
Optional reduced power operation
Hit and hold control can reduce heat during extended energisation. Evaluate the holding margin and release behaviour with the proposed driver, including supply variation and the number of valves operating together.
Technical specifications
Specifications from Parker’s C21 technical literature.
| Parameter | Published specification |
|---|---|
| Valve functions | Two way NC and three way NC |
| Cartridge dimensions | 21 mm diameter, 39 mm length |
| Weight | 60 g |
| Nominal orifices | 1.0, 2.0, 3.0, and 4.0 mm |
| Standard supply | 12 or 24 VDC, ±5% |
| Electrical connection | 80 mm flying leads, 24 AWG |
| Wetted body material | Stainless steel |
| Internal and external seals | FKM or EPDM |
| Operating environment | 0°C to 50°C |
| Storage environment | −40°C to 70°C |
| Recommended filtration | 10 µm |
| Maximum cycling response | 10 ms |
| Reliability reference | 20 million cycles for both functions, 0.90 reliability factor at 95% confidence |
| Internal valve volume | Two way: 1173 µL; three way: 1376 µL |
Flow selection
Use the flow curve and configuration data for the proposed valve. State the gas, temperature, and reference conditions when specifying flow, particularly where requirements are expressed in standard litres per minute. Account for both inlet and outlet pressures when evaluating the operating point and pressure differential.
Measure circuit performance after adding the intended filter, tubing, fittings, and manifold. A valve flow reference does not determine the time required to pressurise or evacuate the connected device volume. Validate these timings under representative operating conditions.
Electrical requirements
Assess supply capacity and thermal loading against coil rating, simultaneous operation, and duty. Measure enclosure temperature during testing.
| Supply voltage | Published power | Coil resistance at 20°C |
|---|---|---|
| 12 VDC | 2.6 W | 56 Ω, ±5% |
| 24 VDC | 2.5 W | 235 Ω, ±5% |
Materials and gas compatibility
Assess stainless steel, internal seals, external seals, manifold materials, and any assembly lubricant against the gas and expected contamination. Select FKM or EPDM using compatibility information for the specific exposure conditions.
Include humidity, cleaning residues, temperature, and storage in the assessment. For oxygen service, confirm material suitability and cleanliness requirements for the actual concentration and pressure. Material names alone do not establish suitability for the assembled device.
The above component specifications come from Parker’s C21 Miniature cartridge Solenoid valve datasheet.
Learn more about Parker Miniature Valves and Components
Manifold and electrical integration
Cartridge cavity and retention
Follow the current Parker cavity and mounting drawings. Parker specifies a maximum insertion force of 200 N and retention at the body indent. Arrange the retaining hardware to react pressure loads through the specified feature.
Control cavity finish, entry geometry, cleanliness, and seal handling during assembly. Confirm lubrication compatibility and provide access for cartridge removal. Include insertion checks, retention inspection, and leak testing in the assembly process.
Hit and hold control
Parker’s optional control guidance specifies at least 100 ms at rated voltage before a hold level of 50% rated voltage. For PWM holding, it gives a minimum frequency of 1 kHz and a nominal 50% duty cycle.
Reduced DC voltage and PWM duty cycle describe different drive methods. Validate the chosen method with the selected valve and circuit. Assess opening, holding margin, release timing, suppression components, and enclosure temperature with the intended number of coils energised together.
Prototype qualification and production selection
the right configuration for procurement
Define flow, leakage, switching, pressure, and thermal criteria. Test simultaneous switching and power loss with the intended filters and connected volume.
Specify the part number, function, orifice, elastomer, voltage, interface, and drive method. Include gas composition, pressures, flow, temperatures, filtration, manifold details, and duty.
Parker lists C21-312EP10FF-000 as a 12 VDC gas valve with a 1.0 mm orifice. Confirm the code, drawing, and required accessories.
Provide quantities, qualification timescales, production forecasts, delivery requirements, and documentation. Assess assembly, testing, maintenance, and lifecycle costs. Review substitutions and configuration changes with engineering.
Discuss your OEM gas control application
AEG’s OEM Fluid Technology Division can guide component selection and assembly development, considering gas compatibility, pressure differential, flow, electrical drive, manifold integration, filtration, and maintenance requirements.
Share your schematic, gas composition, inlet and outlet pressures, required flow, connected volume, switching sequence, electrical supply, temperatures, and quantities. Include pressure rise, venting, or vacuum targets so we can assess suitable valve configurations and integration options.
Browse the Parker C21 pneumatic valve range, or contact Air Engineering Group on 01342 826488 or email info@aegroup.uk.com to discuss your medical, analytical, or life science liquid control application.
Find the right Parker valve for your OEM medical or life science application with guidance from Air Engineering Group. Whether you have a part number, a specification, or a fluid control challenge to solve, we can help you assess suitable options and move your project forward.
From selecting and specifying valves for prototype equipment to procurement and after sales support, AEG works with your engineering and purchasing teams to clarify requirements, address integration challenges, and match valves to your application.
Tell us about your application using the form below. Share the details you have, even if your requirements are still developing, and our team will help you identify the next step.